A|r coordinated three phases of a campus-wide elevator modernization project. A|r was responsible for Phase II and Phase III of the rehabilitation project, including one performing arts stage lift, one scissor lift, and one custom platform lift used in conjunction with the art gallery. Design services were also provided to reconfigure the fume hood exhaust system in the underground Linear Accelerator building. Elevator consultant services included program development, design and construction documents, and construction phase services. Elevator design included the following: